Your building already
has the data.

We make it work.

iviva integrates your existing building systems, business
workflows, and operational data into a single intelligent
platform, without replacing what already works. Reduce risk
and costs, meet compliance, increase revenue, and unlock
AI-readiness across your entire portfolio.

300M+

square feet managed

1M+

data points in largest deployment

10

precincts and cities

20+

years of experience

Most buildings are
data-rich and

insight-poor

Property owners managing existing portfolios face a common
reality: your HVAC system doesn’t talk to your maintenance
platform. Your energy data sits in a silo. Your FM team is reactive.
And every regulatory deadline adds another disconnected layer.

You don’t need to rip and replace. You need a platform that
works
across all of it.

Fragmented systems, invisible information

Legacy BMS and IBMS platforms were never designed
to talk to
each
other, or to modern business workflows. Fault diagnosis is manual, slow, and expensive.

Compliance pressure with no operational
backbone

Green mark, ESG reporting, energy mandates: the
requirements
are
tightening while your data infrastructure remains unfit for purpose.

AI investment stalled at the data layer

AI models are only as effective as the data they
can access.
Without
unified, structured building data, AI delivers nothing at the portfolio level.

Software deployed, value never realised

Most Facility Management platforms are
under-adopted.
Operators
revert to spreadsheets. The gap between deployment and outcome is costing owners
directly.

One
platform.

Every stage of your building’s lifecycle.

Whether you’re managing an existing portfolio or commissioning
a
new development, iviva plugs into the stage you’re at, and grows
with you from there.

1

BIM-based Modelling

Design and Planning

2

Preparation and Construction

Engineering, Procurement
and Construction

3

iviva Commission to Operate +
Integration Platform

Commissioning to Operations
and Systems Integration

  • Digital twin creation
  • 100% MEP verification
  • BIM-to-operations handover
4

iviva Smart FM + Managed Services

Operations & Maintenance

  • Predictive maintenance
  • Workflow automation
  • Cost reduction
  • Compliance tracking
  • Automated fault detection & diagnosis
  • Root cause analysis
5

Smart FM + Managed Services

Energy & Sustainability

  • Real-time energy monitoring
  • ESG reporting
  • Net zero pathway
6

iviva Smart FM

Tenant Experience

  • Inrease convenience, productivity,
    guest experience
  • Tenant service optimisation

Stage 1 and 2 are shown for context — iviva’s core
offering
begins from commissioning through to tenant experience. Existing buildings can enter at Stage 4.

Four
capabilities
that no other platform combines.

Any platform will claim to reduce costs or improve efficiency.
These are the structural differences that determine whether those
outcomes are actually delivered, and sustained.

Open Integration at Depth

iviva connects building MEP systems — many running
proprietary protocols — with building systems and business systems in a
single operational layer. Your elevator, HVAC, maintenance workflow, and energy
reporting talk to each other in real time. This is the foundation that makes AI
deployment on building
data possible.

↑ AI-readiness · ↓ Integration cost ·
Enables portfolio-level intelligence

Model-Based Precise Digital Twin, Not a 3D Building Mode

Most platforms apply rule-based fault detection: if X,
then alert. iviva builds a physics-based model of how your equipment actually behaves,
enabling fault detection with over 95% accuracy, root cause analysis, and predictive
maintenance without excessive sensor deployment. The digital twin is comprehensive, not
cosmetic; it enables behaviour-based analysis and not just rule-based analysis.

↑ AFDD accuracy >95% · ↓ Sensor cost
up to 60% · ↓ Unplanned downtime

Real-Time Monitoring at Scale

The iviva platform has demonstrated capacity to monitor
and control over 1 Million individual points in real time across building complexes —
sensors, valves, components, sub-systems. For mission-critical assets such as Data
Centers, Airports, Hospitals, this scale of visibility is the difference between
operational resilience and catastrophic exposure.

1M+ verified points · Proven in
critical infrastructure

Subject Matter Experts That Close the Adoption Gap

iviva does not deploy and walk away. Structured managed
services, from remote knowledge support through to embedded
field engineers, ensure that operational teams consistently
extract value from the platform. Based on observed deployment
patterns, this directly reduces operational cost and prevents the
under-utilisation that affects most FM software investments.

↑ Platform utilisation · ↓ Operating
cost · ↑ Continuous improvement

Built for every decision-maker
in your organisation.

Select your role to see what iviva delivers for you specifically.


For Property Owners & Asset Managers

You have existing buildings, existing systems, and
growing pressure to reduce cost,
demonstrate ESG performance, and protect NOI. You don’t have the appetite or the
budget to replace infrastructure that still functions.

  • Extend the capability of your existing BMS or IBMS without a rip-and-replace
    programme
  • Consolidate multiple buildings onto a single monitoring and operations platform
  • Generate audit-ready compliance and ESG data with no manual extraction
  • Reduce reactive maintenance costs through predictive fault detection
  • Protect NOI by improving tenant comfort and reducing service failures
  • Position your portfolio as AI-ready for future optimisation at scale

What iviva delivers

iviva.C2O (Commission to Operate) replaces manual,
paper-based commissioning with a
fully digital process, from BIM file to operational digital twin, and hands over a
building
that is verified, documented, and operationally ready.

  • iviva.C2O — 100% MEP point verification,
    automated
    from BIM
  • Digital Handover Package — full asset register,
    test
    records, and system documentation
  • Early FM Integration — operations team onboarded
    during commissioning, not after
  • Variance Detection — live alerts on specification
    deviations, scope drift, and timeline risk
  • Greenfield to Brownfield Continuity — same
    platform
    extends into ongoing operations

For Property Developers & Main Contractors

You’re accountable for delivering buildings that work from Day One. Commissioning
delays,
latent defects, and handover failures are your exposure and your reputation. You
need a
platform that de-risks the build-to-operate transition.

  • Eliminate commissioning delays through real-time digital tracking of all MEP
    testing
  • Detect design mismatches and system deviations before they become post-handover
    claims
  • Deliver a fully validated digital twin at practical completion — at no
    additional cost
  • Compress the gap between practical completion and steady-state operations
  • Differentiate your development with verified smart building credentials for
    tenants

What iviva delivers

iviva.C2O (Commission to Operate) replaces manual,
paper-based commissioning with a
fully digital process, from BIM file to operational digital twin, and hands over a
building
that is verified, documented, and operationally ready.

  • iviva.C2O — 100% MEP point verification,
    automated
    from BIM
  • Digital Handover Package — full asset register,
    test
    records, and system documentation
  • Early FM Integration — operations team onboarded
    during commissioning, not after
  • Variance Detection — live alerts on specification
    deviations, scope drift, and timeline risk
  • Greenfield to Brownfield Continuity — same
    platform
    extends into ongoing operations

300M+

Square feet of buildings and
precincts under management

1M+

Real-time monitoring points
verified in live deployments

10

Precincts and cities deployed
across 4 continents

20+

years of experience and
production-grade operation

Our Success Stories

International Towers Sydney,
Barangaroo

Australia

2017

Integrated Building Management
System
(precinct scale)

Type:

Premium Grade-A commercial office and retail precinct

Total Built Area:

~280,000 sqm

Number of Towers:

3

Challenges
  • Three large commercial towers, each containing numerous
    vendor-specific MEP
    subsystems
    operating independently, making unified operational oversight
    across the
    precinct
    extremely difficult
  • Energy waste going undetected due to manual overrides and
    unauthorised setpoint
    changes,
    with no audit trail to identify who made changes, when, or what
    impact they had
  • No precinct-level platform to coordinate tenant access,
    after-hours air
    conditioning
    requests, parking allocation, and safety workflows consistently
    across all three
    buildings

What iviva Delivered
  • 26+ building subsystems, including HVAC, fire and life safety,
    CCTV, access
    control, and utilities, integrated onto a single platform using
    open industry
    protocols, enabling over 1 million operational data points to be
    monitored and
    managed in real time
  • Full energy governance – every system change tracked,
    attributed, and auditable,
    with automated detection of external overrides and a complete
    point write
    history to support sustainability compliance and certification
  • Template-driven configuration tools that reduced system setup
    and commissioning
    time by 50–70%, alongside digitalised workflows for after-hours
    air
    conditioning, visitor access management, and Permit-to-Work
    safety processes
    across all three towers

Outcomes
  • 10–30% potential reduction in energy costs through automated
    HVAC and lighting
    management
  • 99% system uptime maintained through active-passive cluster
    failover
    architecture, ensuring critical operations are never interrupted
  • Faster fault resolution and fewer on-site engineering visits
    through remote
    diagnostics and real-time equipment monitoring
  • Energy performance data directly underpinning the precinct’s
    6-Star Green Star
    and 6-Star NABERS Energy certification targets

Dubai Festival City

UAE

2007 (shopping mall &
hotels), with additional expansion since

Tenant Experience, and Command &
Control Platform (city scale)

Type:

Large-scale mixed-use urban development comprising offices,
residences, hotels, retail, schools, and recreational facilities

Total Built Area:

~5.6 million sqm

Number of Towers:

20

Challenges
  • An exceptionally diverse operational environment – offices,
    residences, hotels, a shopping mall, schools, a golf course, and
    tourist attractions – each with different systems, service
    requirements, and management needs, creating significant risk of
    siloed, disconnected operations at scale
  • Reactive maintenance and incident management driving up costs
    and creating safety vulnerabilities across a development too
    large for any manual oversight to keep pace with
  • Third party maintenance contractor performance largely
    untracked, with no real-time visibility into service delivery
    quality or accountability for outcomes across the development

What iviva Delivered
  • Building management systems across all 20 buildings integrated
    into a single Command and Control Centre, alongside the
    precinct’s district cooling plant, giving facility teams unified
    monitoring, automated controls, and a single operational view
    across the entire development
  • Real-time alarm and incident management replacing reactive
    responses with structured, proactive safety and operational
    workflows
  • End-to-end contractor performance management with live
    dashboards, measurable service delivery metrics, and clear
    accountability, transforming how external service providers are
    monitored and managed

Outcomes
  • 25% reduction in operating expenses through smarter maintenance
    planning, energy optimisation, and resource allocation
  • Meaningful sustainability gains through integrated district
    cooling management across the entire precinct
  • Proactive incident management delivering stronger safety
    outcomes as well as faster emergency and clean-up responses
  • Facilities management operating with greater control and
    visibility, in part by transforming collaboration with
    third-party service providers from being fragmented and opaque
    to transparent and performance-driven

One Bangkok

Thailand

2025

Integrated Smart Estate
Platform (precinct scale)

Type:

Grade-A integrated development comprising offices, retail,
residences, and hotels

Total Built Area:

~3.5 million sqm

Number of Towers:

12

Challenges
  • Mix of building and operational systems across a large, complex
    precinct serving very different functions – offices, luxury
    residences, five-star hotels, and high-end retail – each with
    distinct design criteria, operational requirements, and occupant
    needs
  • Manual FM processes deemed too cost-inefficient to meet desired
    service level standards, and unable to provide any meaningful
    performance or value-for-money tracking
  • No coherent framework to track and manage sustainability and
    carbon metrics consistently across the entire precinct

What iviva Delivered
  • 26 different building systems and business applications
    integrated onto a single platform — enabling 750,000 sensors,
    motors, and electrical points across the precinct to be
    monitored, coordinated, and controlled in real time, with FM
    workflows fully incorporated into day-to-day building operations
  • Smart FM – automated fault detection, root cause analysis, and
    predictive maintenance across the entire estate, supported by a
    precinct-wide command and control dashboard
  • A platform built to evolve – client’s internal personnel able to
    adapt workflows, add systems, and develop new digital services
    independently, within a simple low-code environment, without
    reliance on external vendors

Outcomes
  • 600+ automated processes delivering a material reduction in
    manual FM workload
  • Superior occupancy experience through unified service requests,
    fulfillment tracking, and visitor coordination tools
  • Sustainability reporting firmly grounded in live operational
    data, supporting the precinct’s low-carbon commitments
  • A scalable architecture that accommodates new systems and
    requirements without disrupting existing operations

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor
incididunt ut
labore et dolore magna aliqua. Ut enim ad
minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo
consequat. Duis aute irure dolor in reprehenderit
in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat
cupidatat non proident, sunt in culpa qui officia
deserunt mollit anim id est laborum.

[Name, Title] · [Property Group], [Country]

Your portfolio.

Performing
as it
should.

iviva is not a bolt-on smart building product. It is the
integration layer that makes your existing infrastructure perform at its true
potential and positions every asset in your portfolio for what
comes next.

FOR EXISTING BUILDINGS

Explore the Integration Platform

See how iviva sits over your current BMS and IBMS
to extend capability immediately.

FOR FM & OPERATIONS TEAMS

See iviva Smart FM in Action

Request a demo tailored to your operational
context and portfolio scale.

FOR NEW DEVELOPMENTS

Commission to Operate — iviva.C2O

Deliver a verified, operationally-ready building
from Day One.